|
Volume 74, Number 28 | November 17 - 22, 2004
Villager photos by Jennifer Bodrow
Interim field of dreams
Most of the artificial-turf surface for a new, interim sports field has been rolled out on Pier 40s inner courtyard. New lights for nighttime use have also been installed. The strips of FieldTurf still need to be sewed together and a mix of sand and rubber pellets still needs to be poured onto it to provide give and cushioning. There wont be any locker rooms built on the pier at the end of W. Houston St., but bathrooms will be available for clothes changing. The sports facility is slated for an early-January opening, with a gala ribbon-cutting ceremony set for spring. Permits have been distributed for use by local youth and adult leagues until the spring season, when new permits will be issued.
|
|
Home
The Villager is published by
Community Media LLC.
The Villager | 487 Greenwich St., Suite 6A | New York, NY 10013
Phone: 212.229.1890 | Fax: 212.229.2790
Email: news@thevillager.com
|
Written permission of the publisher must be obtainedbefore any of the contents of this newspaper, in whole or in part, can be reproduced or redistributed.
|