Volume 74, Number 47 | March 30 - April 05, 2005

Villager photo by Robert Stolarik

Crack response

Evidence of cracking in a floor slab in the elevator bank in the cellar of 21 Bond St. between Bowery and Lafayette St. brought firefighters to the building next door to a construction site at 23 Bond St. at 11 a.m. Wed., March 23. The Department of Buildings stopped construction for a while and the street was closed until stress tests indicated that the building was safe.

Reader Services


Email our editor



The Villager is published by
Community Media LLC.

The Villager | 487 Greenwich St., Suite 6A | New York, NY 10013

Phone: 212.229.1890 | Fax: 212.229.2790
Email: news@thevillager.com

Written permission of the publisher must be obtainedbefore any of the contents of this newspaper, in whole or in part, can be reproduced or redistributed.